Try it · 3 minutes

How ready is your data for S/4HANA?

Answer twelve questions, two for each of the six areas of a platform-led migration. You get a score per area and the weakest point in your data path.

Metadata-driven
We have a complete, system-generated list of every source system, table and file in scope.
Metadata-driven
Every target field can be traced back to its source field and the rule that changed it.
AI-assisted & automated
Field mappings are proposed by tooling and approved by the team, not typed by hand in spreadsheets.
AI-assisted & automated
Extraction and conversion jobs are generated from approved mappings, not hand-written scripts.
Quality built in
We know the completeness and duplicate rate of each object before mapping starts.
Quality built in
Cleansing and de-duplication rules run automatically in every cycle.
Validated against the target
Validation rules check against reference data pulled from the S/4HANA target.
Validated against the target
Every object gets a side-by-side pre-load review and approval before it is loaded.
RCA
When records fail, we can find the root cause within hours, not days.
RCA
Defects fixed in one test cycle do not come back in the next.
Source to sign-off
Loaded data is read back from S/4HANA and reconciled with the source record by record.
Source to sign-off
Each phase (build, mocks, SIT, UAT, cutover) is signed off with stored evidence.